
Capacity expansion for a manufacturer of bakery products
Location: Erpe-Mere - East Flanders
Our client in Erpe-Mere, a manufacturer of industrial bakery products, needed to expand its production capacity. This required a completely new production building with several new production lines. In addition, a completely new boiler house was required to support increased demand and future growth.
After extensive analysis, BBC came up with a boiler house engineering proposal that carefully matched steam capacity and piping to production. This design provides guaranteed redundancy, ensuring continuity of steam supply at all times.
Solution


