Capacity expansion for a manufacturer of bakery products

Location: Erpe-Mere - East Flanders

Our client in Erpe-Mere, a manufacturer of industrial bakery products, needed to expand its production capacity. This required a completely new production building with several new production lines. In addition, a completely new boiler house was required to support increased demand and future growth.

Analysis

After extensive analysis, BBC came up with a boiler house engineering proposal that carefully matched steam capacity and piping to production. This design provides guaranteed redundancy, ensuring continuity of steam supply at all times.

Solution

  • CSB 2000 (1600kg steam/hour) + 2x CSB 1250 (2 x 1100kg steam/hour)
  • 3 new steam boilers + water feed tank + steam collector
  • Implementation complete piping in the boiler house + piping to the new production hall

CONTACT

Bosch