New steam boiler for fiberglass solutions specialist

Location: Battice - Liège

Our client specialized in fiberglass solutions from Battice in the province of Liège wants to replace its old boiler room with inefficient water pipe boilers with modern, efficient solutions. Over the years, production has changed, making the current boilers far too large and inefficient.

Analysis

After intensive discussions between the customer, our team and the engineering firm, it was decided to install two high-efficiency flash pipe steam boilers, each with a capacity of 6 tons per hour. Great attention is paid to ensuring a continuous supply of steam.

Solution

  • 2x UL-S IE 7000×10
  • 1x complete degassing system
  • Cascade control of steam boilers.
  • Continuous monitoring of the installation remotely using a VPN connection

CONTACT

Bosch